80 F
Aruba
75.5 F
Bahamas
74.9 F
Barbados
83.4 F
Curazao
79.9 F
Jamaica
78.9 F
Trinidad and Tobago

Introducing IBM Power11

Must read

New applications are expected by 2028 and enterprises are drowning in complexity

Which makes keeping critical systems continually running a near impossible task and these challenges will only intensify as enterprises strive to remain competitive in the AI era.

TD SYNNEX is the sole distributor of IBM solutions throughout the English and Dutch Caribbean
TD SYNNEX is the sole distributor of IBM solutions throughout the English and Dutch Caribbean

Highly resilient organizations will achieve business success in the AI era

  • 70% of business leaders say their tech architecture creates confusion, conflict and disagreement
  • 65% of business leaders say their tech architecture is critical to how they use IT to improve business performance
  • 92% of executives agree that their organization’s workflows will be digitized and will leverage AI enabled automation by 2025

Announcing IBM Power11

Autonomous IT built for the AI era

Engineered to accelerate enterprises into the AI era

  • Hybrid Cloud Platform
  • Operating Systems & Firmware
  • Computing Hardware
  • Silicon Technology

Built on a foundation of performance, availability, and security

  • 0 Planned downtime with end-to-end automation
  • < 1min guaranteed ransomware detection with automated response and recovery within minutes
  • 5X increase in business process rate with AI integration into existing enterprise workflows
  1. Based upon IBM internal testing of system upgrade scenarios; many (i.e. VIOS, hot plug adapters, I/O adapter FW, and concurrent system firmware updates) can be done in place while some (i.e. non concurrent system FW and HW maintenance) may require Live Partition Mobility (LPM) support.
  2. This guarantee covers only the displaying of an alert in less then one minute. Remediation is in the form of drive replace men t up to the cost of the Covered Product. Terms and conditions apply; full details can be found here. (Coming to IBMi in 4Q 2025, Roadmap for PowerVS)
  3. Geisgroup.eu , Uwe Remppel, head of ZSI department, Geis Group *: Measured in staging system.

Total coverage for unprecedented business continuity

  1. Based upon estimated average entire system unplanned downtime for Power E1180 systems as calculated in the Power11 Processor Based Systems RAS (see section: Enterprise Single Server Availability Standard)
  2. Based upon IBM internal testing of system upgrade scenarios; many (i.e. VIOS, hot plug adapters, I/O adapter FW, and concurre nt system firmware updates) can be done in place while some (i.e. non concurrent system FW and HW maintenance) may require Live Partition Mobility (LPM) support.
  3. This guarantee of an alert in less then one minute. Remediation is in the form of drive replacement up to the cost of the Covered Product. Terms and conditions apply; full details can be found here . (Coming to IBMi in 4Q 2025, Roadmap for PowerVS)
  4. Recovery is defined as the time it takes to for a Safeguarded Copy to be available in the same Flash System or moved to another defined host server attached to that Flash System. Does not include host server recovery actions that are application depe nde nt. Terms and conditions apply; full details can be found here

Average annual cost of planned downtime $5.6M

  • Typical maintenance window is several hours.
  • Multiple maintenance windows each year

Average amount of time spent by IT team managing maintenance 25-40%

  • Understanding & testing required maintenance levels
  • Planning for maintenance windows, including navigating business priorities.
  • Executing upgrades, often during nights & weekends

Be a leader in core banking uptime with Zero Planned Downtime

Ensure banking services are always available

Increase customer satisfaction and trust with no planned service disruptions

Enhance compliance and regulatory posture 

Install critical security fixes quickly and seamlessly with agile platform updates

Close the operational efficiency gap


Extreme Automation

  • Minimize application downtime = 0 planned downtime with end-to-end maintenance
  • Automate data collection for faster error resolution

Reduced Costs

Enhance energy efficiency
• 2x better performance per watt vs x86
• 28% better server efficiency with Energy-Efficient mode

Optimized Workloads

Improve performance and TCO
• 51% lower 3-year solution cost for payment apps vs. x86
• 4X performance per core for core banking with OpenShift
• Up to 15% improved out-of-box performance for commercial ERP

Deploy enterprise-grade AI across business workflows with IBM Power11

Scale AI across the enterprise

  • Transform enterprise processes with simplified AI integration
  • Boost productivity with assistants and agents
  • Unlock enterprise data with data fabric and platforms

Unlock business-driven workload placement

Accelerate impact with consistency, not complexity

  • 15x – Faster testing and release cycles delivering higher quality
  • 50% – Faster recovery with 80% less cost by adding IBM PowerVS as a Disaster Recovery site
  • 5 – Day Onboarding Guarantee
  • 25% – Faster migration to SAP RISE on IBM PowerVS vs other clouds
  • 14x – Less hypervisor CVEs than other IaaS clouds
  • >25% – Lower TCO compared to other IaaS clouds

IBM’s adoption of RISE with SAP to modernize its operations

One of industry’s largest RISE-enabled cloud modernization of quote-to-cash and record-to-report operations is running on IBM Power Virtual Server on IBM Cloud

  • 150K Users
  • 175+ Countries
  • 30% Reduced infra ops costs

Accelerated RISE move, with “Like for Like” migration across Power and Intel x86 

More automation, standardized processes

Persistent business process innovation with cleaner ERP core

Power11 Portfolio and Innovation

An Edge to Cloud platform with core innovation by design

New Energy Efficient operating mode that optimizes power consumption without compromising SLAs

New2.5D Integrated Stacked Capacitor and innovativethermal technologies to optimize power consumption

Improved performance through workload isolation with Resource Groups

Next-generation memory with 3X DDR bandwidth delivers performance to larger, memory-intensive applications

New off-chip AI acceleration based on IBM Spyre planned for 4Q25

Edge

P11 1-socket coming soon

Core

S1122 & L1122
S1124 & L1124
E1150
E118

Cloud

Power11 availability on Day-1

Portfolio IBM Power11 disponible en TD Synnex

More articles

- Advertisement -spot_img

Latest article